Ironvane Roofing is a fictional business — a live demo of qualified.at lead intake. See all 10 demos What is qualified.at?

Roofing & exterior restoration

Storm-tested crews. Straight answers.

Repairs, full replacements and storm work, done by crews who have been on the same trucks for years. You get a real number before anyone climbs a ladder — priced off the roof itself, not off how the week is going.

On the board this week

Estimate turnaround
24 hrs
Emergency tarping
Same day
Crews in the field
9
Deposit to schedule
$0

What we’re set up for

Four kinds of work, four different trucks. The estimator asks which one you are before it asks anything else, because a shingle repair and a claim-backed re-roof have almost nothing in common.

Repair

A defined problem in a defined area — lifted shingles, a failed valley, flashing that was never right. Priced by the damaged area, not the house.

Full replacement

Tear-off, deck inspection, ice-and-water at the eaves and valleys, new underlayment, new roof. Two to four days and a dumpster in the driveway.

Storm & insurance claims

Wind, hail, fallen limbs. Slope-by-slope test squares and a documented scope an adjuster will accept — and we meet them on the roof.

Full exterior

Siding, gutters, downspouts, trim and attic ventilation. Cheaper to do while the staging is already up, and it only gets scoped once.

Twenty years on other people’s roofs

2006 Year we started
11,400+ Roofs completed
10 yr Workmanship warranty
4.8 Average job rating
Licensed — Lic. #RC‑118427 $2M liability insured Workers’ comp on every crew Bonded since 2009

How the number gets built

No mystery and no menu. A roof estimate is arithmetic, and it is the same arithmetic every contractor in the trade uses. Here it is.

01 / SQUARES

How much roof

A roofing square is 100 square feet. Area sets the size of the job and everything after it is an adjustment. A rough guess is genuinely fine — we measure it properly on site before anything is signed.

02 / PITCH

How steep it is

Flat, walkable, or steep enough that a crew has to be tied off. Steep and multi-story roofs need staging and fall arrest. That is labour and equipment, not markup.

03 / MATERIAL

What goes on it

3-tab, architectural, wood shake, metal, tile or slate — each one is a different material cost and a different crew day. We assume like-for-like; an upgrade is priced as the difference, shown separately.

Roof area × rate Pitch Material Age of deck Extras Your estimate

Tell us what’s going on up there

Describe the roof in your own words — age, material, what you are seeing, and whether a storm had anything to do with it. The estimator reads it, works out which questions still matter, and gives you a real number at the end. It opens on its own in a moment — or use the Price my roof button in the corner.

It never asks your name, your email, or your address. Nothing it asks identifies you or your house.

Free custom demo

Build me a demo for my industry.

Tell us your trade and town. We’ll stand up a branded instant-quote flow and email you the link — no sales call required.

Usually within one business day. No card. Free plan to start.